Rapid prototyping
To help develop this article, click 'Edit this article' above.
A recent technology, since the 1980s this has been an important asset for countless industries and projects that need an extra level of rendering to enhance work done.
An additive process – rapid prototyping uses materials such as adhesives and photopolymers – by joining particles and layers of raw materials together to create the desired shape. It differs from more traditional processes, which typically compress and subtract rather than add.
First, a virtual 3D model must be created using CAD software. This digital rendering is a simulation of the final product. The design is then converted so that the prototype can be printed as efficiently and accurately as possible – allowing the printer to interpret the design in a language it understands. Checks are needed throughout the process to ensure no mistakes are made during printing.
There are a number of benefits of rapid prototyping:
- Short turnarounds.
- Accuracy ensured before the final product is constructed.
- Cost-efficient.
- High-quality product.
- It can produce small parts and cavities.
- It allows issues to be corrected at the beginning of the process rather than carrying them into the final product.
- It is 'eco-friendly' as it generates less waste.
See also additive manufacturing.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.